MoonPool.jpg

Technip Oilexco Shelley Project

Technip Logo

Technip Oilexco Shelley Project

Technip Oilexco Shelley Project

Project No: 835
Project Name: Technip Oilexco Shelley Project
 

Description of product

Provision of Hang-off Flange, Seal and Split Collar.

The purpose of the Hang-off Flange, Seal and Split Collar assembly is to provide a structural support for the riser which can be sealed against the riser end fitting.

In principle the Hang-off Flange should be installed with the maximum internal bore to permit the pull-through of the riser end fitting. Followed by the installation of a Split Seal and Collar arrangement.

Project responsibilities

• TECHNIP Owners / operator of platform
• Subsea Innovation Hang-Off Flange supplier